Last updated: 21 March 2024
Published: 9 October 2023
Published: 4 October 2023
Published: 2 October 2023
Published: 1 October 2023
Published: 12 September 2023
Published: 1 September 2023
The Murray–Darling Basin Authority (MDBA) and Goulburn-Murray Water will start works to reinstate the Mildura Weir next week.
Published: 7 May 2023
The spillway gates at Hume Dam will open this week as the Murray–Darling Basin Authority and WaterNSW carry out routine maintenance.
Published: 17 May 2023
The Murray–Darling Basin Authority and WaterNSW will begin lowering the weir pool in the Murray River at Euston on 29 May to assist with minor repairs to the weir.
Pagination
- Previous page
- Page 2
- Next page