Search results
Displaying 51 - 60 of 60
30 June 2011
This report analyses the phytoplankton data set for 1980-2008 and provides information for enhanced monitoring and management of algae in the River Murray.
Tumudgery Creek was disconnected from the Edward River in September 2007 to achieve water savings as part of drought contingency planning.
Back Creek was disconnected from Yallakool Creek (subsequently the Edward River) in September 2007 to achieve water savings as part of drought contingency planning.
17 May 2011
Record low inflows and river levels in recent years have led to the drying of many wetlands in the Murray–Darling Basin.
Record low inflows and river levels in recent years have led to the drying of many wetlands in the Murray–Darling Basin.
11 December 2009
The 'demonstration reach' concept is a model with which to implement a holistic approach to native fish recovery in the Murray–Darling Basin's river systems.
1 February 2009
The then Murray–Darling Basin Commission (MDBC), now Murray–Darling Basin Authority (MDBA) is funding the construction of 14 new fishways on the Murray River under the 'Sea to Hume Dam' fishway program.
Pagination
- First page
- Previous page
- 1
- 2
- 3
- 4
- 5
- 6