Search results
Displaying 11 - 20 of 68
The Living Murray (TLM) is celebrating its 20th birthday.
22 December 2023
As the Murray–Darling Basin Authority reflects on the year that was, we acknowledge it has been a year of hard work, achievement, and dedication – helping make the river system more sustainable for generations to come.
14 December 2023
This year marks 20 years of The Living Murray program.
12 December 2023
Two decades of cooperation, restoration, and protection of the river system.
15 September 2023
The Chowilla Floodplain was inundated in late 2022 – monitoring shows the ecosystem is now thriving.
23 April 2023
It is up to individual irrigators to determine what they grow, what the water requirements are for their selected crops and how much water will be needed for different growth stages and their region's climatic conditions.
21 December 2022
In response to the declining flow capacity, the increasing risks, and the recommendation that a range of intervention measures be investigated, the MDBA instigated the Barmah–Millewa Feasibility Study (BMFS). Six options were investigated as part of the Barmah–Millewa Feasibility Study.
15 November 2022
Sam O’Rafferty is an emerging young leader who is passionate about solving water efficiency problems for growers.
The Murray–Darling Basin Authority (MDBA) operates the River Murray to share water between New South Wales, Victoria and South Australia, as required under the Murray–Darling Basin Agreement. To undertake this work the MDBA has built, maintained and operated a hydrological model of the River Murray.
The delivery of water from the major storages in the Upper Murray to irrigators throughout the Basin can be challenging. There are a number of constraints that impact water delivery to below the Barmah Reach, such as the length of time required to deliver water and the amount of water that can be delivered at any one time.