Search results
Displaying 21 - 30 of 88
12 September 2023
The pool level at Euston Weir is temporarily being lowered to allow for works to repair damage sustained during last year’s flooding.
The Murray–Darling Basin Authority (MDBA) and Goulburn-Murray Water will start works to reinstate the Mildura Weir next week.
The Murray–Darling Basin Authority and WaterNSW will begin lowering the weir pool in the Murray River at Euston on 29 May to assist with minor repairs to the weir.
The spillway gates at Hume Dam will open this week as the Murray–Darling Basin Authority and WaterNSW carry out routine maintenance.
28 April 2023
Together with the Basin states, we manage Basin structures to control flows and supply and manage stored water.
23 April 2023
Some of our 2023 graduate program cohort found surprises on a recent tour of the Sunraysia region’s salt interception schemes.
20 February 2023
All the River Murray locks and weirs are going back in after recent floods. Here’s why they’re so important.
1 February 2023
We have prepared a guide to help new infrastructure proponents and water planners understand how water infrastructure developments intersect with water management requirements in the Basin Plan, and obligations set out in the Murray–Darling Basin Agreement.
16 November 2022
The JS Collings Trophy is awarded annually by the MDBA for excellence in the maintenance of infrastructure along the River Murray.
15 October 2022
Dartmouth Dam captures the high-quality alpine water flowing down the Mitta Mitta River and from its tributaries.