Search results
Displaying 1 - 10 of 425
Early work is underway to design a replacement for the Mildura Weir — an essential piece of infrastructure that has supported water delivery, navigation and recreation in the region for nearly a century.
20 May 2025
The release from Dartmouth Dam will reduce starting Friday 23 May 2025.
The Murray–Darling Basin Authority (MDBA) met 15–16 May 2025 on the lands of the Ngunnawal people in Canberra (ACT).
16 May 2025
Flows in the River Murray system vary widely depending on a range of factors, including rainfall, inflows, evaporation, and demands for water from all users.
12 May 2025
Transfers from Dartmouth Dam to Hume Dam are expected to continue throughout May and the coming months if conditions remain dry.
24 April 2025
Transfers from Dartmouth Dam to Hume Dam are expected to continue throughout March and the coming months if conditions remain dry.
17 April 2025
The Murray–Darling Basin Authority (MDBA) met on 16 April 2025 on the lands of the Ngunnawal people in Canberra (ACT).
The Murray–Darling Basin Authority (MDBA) encourages everyone to check local conditions to make the most of their time on and around the river this Easter.
10 April 2025
Transfers from Dartmouth Dam to Hume Dam are expected to continue throughout March and the coming months if conditions remain dry.
8 April 2025
Flows in the River Murray system vary widely depending on a range of factors, including rainfall, inflows, evaporation, and demands for water from all users.