Search results
Displaying 1 - 3 of 3
5 March 2024
An independent review has given the tick of approval to the MDBA’s decisions in managing the River Murray during 2022–23.
21 March 2023
The Murray–Darling Basin Authority is moving ahead with detailed design work on a suite of options to improve the movement of water through the Barmah–Millewa Reach of the Murray River.
9 December 2019
In 2007–2008 CSIRO Murray-Darling Basin Sustainable Yields (MDBSY) project published a series of reports documenting water availability across the Murray-Darling Basin, including an assessment of the likely impacts of climate change to ~2030 on water availability (e.g. CSIRO 2008a).