Search results
Displaying 1 - 10 of 11
Goulburn–Broken communities will continue to have the opportunity to share their diverse opinions and knowledge on Basin issues and opportunities.
6 February 2025
Sam joined the Murray–Darling Basin Authority (MDBA) in December 2024, and will be working alongside 7 other REO’s as we embark on a big year in our journey to Rivers, for generations.
The Albury-Wodonga region supports a wide range of agriculture, communities, recreation and tourism. This year it is the home of the MDBA’s annual regional water conference – River Reflections, and we want to see you there.
12 September 2023
The pool level at Euston Weir is temporarily being lowered to allow for works to repair damage sustained during last year’s flooding.
13 July 2023
The Murray–Darling Basin Authority and Goulburn–Murray Water will begin to remove the weir at Mildura next week to allow for high flows expected to arrive in coming weeks.
16 June 2023
The pool level at Euston weir is temporarily being raised before being drawn down again to complete repair works to minor damage sustained during recent flooding.
The weir pool on the River Murray at Mildura will return to its usual level over the coming week as work to reinstate the Mildura weir nears completion.
Work is underway by the Murray–Darling Basin Authority and Goulburn–Murray Water to reinstate the Mildura weir and lock 11.
19 January 2023
The Euston weir and lock 15 will be reinstated next week as high flows in the River Murray continue to recede.
16 November 2022
The JS Collings Trophy is awarded annually by the MDBA for excellence in the maintenance of infrastructure along the River Murray.