Search results
Displaying 1 - 10 of 19
2 August 2024
A suite of options to improve the movement of water through the Barmah–Millewa Reach of the Murray River.
1 August 2024
The Barmah Forest in Victoria and the Millewa Forest in New South Wales include wetlands of international significance. Report cards are updated every year.
1 August 2024
Monitoring reports from the Barmah–Millewa Forest, one of The Living Murray icon sites.
A renewed agreement between WaterNSW and Murray Irrigation Limited (MIL) will help to move water around the Barmah Choke for the 2024–25 water year.
7 February 2024
2023 MDBA graduates share highlights, challenges and where to next.
The 2023 JS Collings Trophy for excellence in maintaining major water management infrastructure on the River Murray has been awarded to Mildura Weir by the Murray–Darling Basin Authority (MDBA).
30 October 2023
In 2019, the MDBA undertook a detailed survey of the River Murray channel through the Barmah–Millewa Reach. This revealed the presence of a very large quantity of sand on the bed of the river, something that was not expected. Since then, several further studies have been undertaken to investigate the extent and source of the sand, the rate that it is moving at and options to manage it. Reports of these studies are provided below.
12 September 2023
The pool level at Euston Weir is temporarily being lowered to allow for works to repair damage sustained during last year’s flooding.
Barmah–Millewa Feasibility Study wrap up from the MDBA.
26 January 2023
In response to the declining flow capacity, the increasing risks, and the recommendation that a range of intervention measures be investigated, the MDBA instigated the Barmah–Millewa Feasibility Study (BMFS). Six options were investigated as part of the Barmah–Millewa Feasibility Study.