Search results
Displaying 21 - 30 of 69
12 December 2023
Two decades of cooperation, restoration, and protection of the river system.
8 November 2023
Andrew McConville, MDBA Chief Executive, shares his thoughts on recent events, activities and progress.
30 October 2023
In 2019, the MDBA undertook a detailed survey of the River Murray channel through the Barmah–Millewa Reach. This revealed the presence of a very large quantity of sand on the bed of the river, something that was not expected. Since then, several further studies have been undertaken to investigate the extent and source of the sand, the rate that it is moving at and options to manage it. Reports of these studies are provided below.
12 September 2023
The pool level at Euston Weir is temporarily being lowered to allow for works to repair damage sustained during last year’s flooding.
11 September 2023
Ongoing fish monitoring in the Barmah–Millewa Forest is used to monitor the health of the waterways.
13 July 2023
The Murray–Darling Basin Authority and Goulburn–Murray Water will begin to remove the weir at Mildura next week to allow for high flows expected to arrive in coming weeks.
A wrap-up from our recent River reflections conference, held in Narrabri New South Wales.
16 June 2023
The pool level at Euston weir is temporarily being raised before being drawn down again to complete repair works to minor damage sustained during recent flooding.
Barmah–Millewa Feasibility Study wrap up from the MDBA.
The 2023 River reflections regional conference will tackle the big picture of the Murray–Darling Basin's future and take an international perspective on Basin management in a changing climate with renowned sustainable river ecologist Professor N. LeRoy Poff from the University of Canberra and Colorado State University.