Pre-2009 water recovery includes all known water recovery between 2004 to 2009.
This reflects water recovered across the Murray–Darling Basin that has been included in the calculations for the baseline modelling work for the Basin Plan. Some of this water may have been recovered after 2009 and is included in the baseline model.
Volumes shown reflect both the actual recoveries and recoveries close to completion and finalisation, in these programs, to 30 June 2011, calculated using long term diversion limit equivalent (LTDLE) factors used by each program. These factors are not necessarily the same as current LTDLE factors.
Publication title | Published | File type | File size | |
---|---|---|---|---|
Pre-2009 water recovery table 2017 | 02 May 2017 |
|
89.85 KB |
Published date: 2 May 2017