New South Wales Murray–Darling Basin Porous Rock water resource plan

This water resource plan is the prevailing management plan for the groundwater resources in the New South Wales Murray–Darling Basin Porous Rock water resource plan area.

The plan was accredited by the Australian Government Minister as being consistent with the Basin Plan and commenced on 24 December 2022. The Minister’s decision instrument and the explanatory statement are available on the Federal Register of Legislation.

Key documents informing the recommendation decision are set out below.

The NSW Murray–Darling Basin Porous Rock water resource plan is made up of a number of documents. The key document is the NSW Murray–Darling Basin Porous Rock water resource plan.

The accredited versions of these documents are available below.

Consultation reports – Attachments to Schedule C

If you would like to request a copy of one of these reports please contact the MDBA.

Publication title Published File type File size
Attachment A – Culturally appropriate First Nations consultation report with Barapa Barapa Nation
Attachment D – Culturally appropriate First Nations consultation report with Maraura Nation
Attachment E – Culturally appropriate First Nations consultation report with Muthi Muthi
Attachment F – Culturally appropriate First Nations consultation with Nari Nari Nation
Attachment G – Culturally appropriate First Nations consultation report with Ngarabal Nation
Attachment H – Culturally appropriate First Nations consultation with Ngiyampaa Nation consultation report
Attachment K – Culturally appropriate First Nations consultation report with Wadi Wadi Nation
Attachment L – Culturally appropriate First Nations consultation report with Wemba Wemba Nation
Attachment N – Culturally appropriate First Nations consultation with Wiradjuri Nation – Volume 1 of 3: Lachlan River Valley
Attachment N – Culturally appropriate First Nations consultation with Wiradjuri Nation – Volume 2 of 3: Macquarie River Valley
Attachment N – Culturally appropriate First Nations consultation – Wiradjuri Nation – Volume 3 of 3: Murrumbidgee River Valley (and Murray River)
Attachment O – Culturally appropriate First Nations consultation report with Yorta Yorta
Supporting documents
Publication title Published File type File size
Water Management Act 2000 No 92 (as at 23 November 2012) 22 Feb 2022
PDF
1.27 MB
Water Sharing Plan for the NSW Murray Darling Basin Porous Rock Groundwater Sources 2011 (as at 6 July 2012) 11 Aug 2022
PDF
805.08 KB
Namoi long term water plan – Part A: Namoi Catchment 19 Jan 2023
PDF
4.53 MB
Namoi long term water plan – Part B: Namoi Planning units 19 Jan 2023
PDF
8.00 MB
Namoi long term water plan – Part A: Namoi Catchment – draft for exhibition 19 Jan 2023
PDF
4.60 MB
Namoi long term water plan – Part B: Namoi Planning units – draft for exhibition 12 Dec 2022
PDF
8.19 MB
Gwydir long term water plan – Part A: Gwydir catchment 03 Mar 2023
PDF
4.94 MB
Gwydir long term water plan – Part B: Gwydir planning units 03 Mar 2023
PDF
9.98 MB
Gwydir long term water plan – Part A: Gwydir catchment – draft for exhibition 10 Mar 2023
PDF
4.57 MB
Gwydir long term water plan – Part B: Gwydir planning units – draft for exhibition 20 Jul 2022
PDF
8.71 MB
Macquarie–Castlereagh long term water plan – Part A: Macquarie–Castlereagh catchment 27 Mar 2023
PDF
3.35 MB
Macquarie–Castlereagh long term water plan – Part B: Macquarie–Castlereagh planning units 27 Mar 2023
PDF
2.98 MB
Macquarie–Castlereagh long term water plan – Part A – draft for exhibition 12 Sep 2022
PDF
3.35 MB
Macquarie–Castlereagh long term water plan – Part B – draft for exhibition 12 Sep 2022
PDF
4.22 MB
Murrumbidgee long term water plan – Part A: Murrumbidgee catchment 11 Jan 2023
PDF
3.80 MB
Murrumbidgee long term water plan – Part B: Murrumbidgee planning units 11 Jan 2023
PDF
7.57 MB
Murrumbidgee long term water plan – Part A: Murrumbidgee catchment – draft for exhibition 11 Jan 2023
PDF
4.17 MB
Murrumbidgee long term water plan – Part B: Murrumbidgee planning units – draft for exhibition 11 Jan 2023
PDF
7.52 MB
Murray–Lower Darling long term water plan – Part A: Murray–Lower Darling catchment 06 Jan 2023
PDF
6.36 MB
Murray–Lower Darling long term water plan – Part B: Murray–Lower Darling planning units 06 Jan 2023
PDF
11.77 MB
Murray–Lower Darling long term water plan – Part A: Murray–Lower Darling catchment – draft for exhibition 06 Jan 2023
PDF
5.62 MB
Murray–Lower Darling long term water plan – Part B: Murray–Lower Darling planning units – draft for exhibition 06 Jan 2023
PDF
7.25 MB
New South Wales Border Rivers long term water plan – Parts A and B 22 Feb 2022
PDF
7.68 MB
New South Wales Border Rivers long term water plan – Parts A and B – draft for exhibition 20 Jul 2022
PDF
4.71 MB
Native Title determination for the Barkandji Traditional Owners #8 - Part A 20 Jul 2022
PDF
150.57 KB
Native Title determination for the Barkandji Traditional Owners #8 - Part B 20 Jul 2022
PDF
137.91 KB
NSW Water Strategy 22 Feb 2022
PDF
16.22 MB
A pathway to Cultural Flows in Australia 30 Aug 2022
PDF
1.23 MB
Cultural Flows — A guide for First Nations 30 Aug 2022
PDF
1.73 MB
Cultural flows – A guide for water managers 30 Aug 2022
PDF
1.31 MB
Relevant legislation
Publication title Published File type File size
Water Management Act 2000 No 92 17 Aug 2022
PDF
1.40 MB
Water Management (General) Regulation 2018 21 Mar 2023
PDF
2.20 MB
Water Act 2007 (Cth) 11 Aug 2022
PDF
4.24 MB
Basin Plan 2012 11 Aug 2022
PDF
3.97 MB
Access Licence Dealing Principles Order 2004 30 Aug 2022
PDF
355.84 KB

Published date: 23 March 2023