Search results
Displaying 101 - 110 of 149
The Southern Murray–Darling Basin 2015–16 environmental watering summary provides a high-level overview of watering actions in 2015-16.
This is a technical report by Alluvium Consulting. This report contains advice to the Murray-Darling Basin Authority concerning key ecosystem functions and their water requirements.
This document is the last annual implementation report of the Basin Salinity Management Strategy (BSMS) that was implemented by the MDBA and Basin governments from 2001 to 2015.
As part of the Northern Basin review we have re-assessed the environmental water requirements for the river systems. As a result of this assessment, updates were made to the Condamine-Balonne and Barwon-Darling environmental water requirements reports.
11 September 2019
The Murray–Darling Basin Authority met on 10 and 11 September 2019 in Canberra against the backdrop of worsening drought in the Basin, with the Bureau of Meteorology advising that winter this year had been the driest since 1982 and the fourth driest on record. These conditions are reflected in extremely low storage levels in the northern Basin and low inflows continuing in the southern Basin.
10 July 2019
The Murray–Darling Basin Authority's Chief Executive, Phillip Glyde, welcomed the announcement that environmental water holders will be using water bought to benefit the environment in the coming weeks.
At its meeting on 7-8 May 2019 in Canberra, the Murray–Darling Basin Authority noted the meeting was held during federal caretaker period. The Authority was able to progress a number of key items including water resource plans, river management and climate change.
12 April 2019
As part of ongoing monitoring, the MDBA and the Commonwealth Environmental Water Office commissioned the University of Adelaide to find out if Yarra Pygmy Perch reintroduced into the Lower Lakes after the Millennium Drought were still present in the wild.
2 March 2019
The annual outlook describes seasonal and ecosystem conditions and gives an indication of the watering priorities for the coming year.
18 December 2018
The MDBA has published the latest quarterly report on water resource plan (WRP) progress, highlighting significant challenges in ensuring all WRPs are in place and meet the exacting requirements of the Basin Plan by the 1 July 2019 deadline.