Search results
Displaying 1 - 10 of 73
11 February 2025
This report presents a stocktake and analysis of completed, current and proposed activities and initiatives which focus on improving longitudinal surface water connectivity across the northern Murray–Darling Basin (the northern Basin) ‘to and through’ Menindee Lakes.
Longitudinal connectivity along and between river reaches is critical for maintaining healthy ecosystems and supports a wide range of social, cultural and economic values.
The Murray–Darling Basin Authority (MDBA) has reassured communities the storages and weirs are well positioned to meet irrigation, community, and environmental needs this summer.
13 November 2024
The sustainable use of groundwater is vital to ensuring the health of the Murray–Darling Basin.
14 August 2024
Despite a dry start to the water year with inflows well below average, the total active storage volume for the Murray–Darling Basin remains high at 6,770 gigalitres (GL).
A renewed agreement between WaterNSW and Murray Irrigation Limited (MIL) will help to move water around the Barmah Choke for the 2024–25 water year.
10 Basin towns across Victoria have been announced as finalists of the 2024 Transport Accident Commission (TAC) Victorian Top Tourism Town Awards.
Murray River #2 Aussie Icon as determined by Australian Traveller magazine
16 April 2024
We have offices and staff scattered throughout the Basin, giving our team a front row seat to community activities and Basin operations. Check out some of the recent photos our staff have snapped throughout April.
28 March 2024
With the warm sunny days still upon us, this weekend is the perfect opportunity to soak up the beauty of the Murray–Darling Basin or take part in the many activities and events happening across Basin catchments and communities.
25 March 2024
Following several years of significant rainfall and higher river levels in the Murray during Autumn, river users can expect a return to lower levels this Easter.