Search results
Displaying 111 - 120 of 138
15 November 2016
The Murray–Darling Basin Authority (MDBA) has updated the annual environmental watering priorities for 2016-17 following wet conditions across the basin.
26 August 2016
The Murray–Darling Basin Authority (MDBA) was established to implement and monitor the Basin Plan — a plan that is about ensuring a healthy and productive river system for future generations.
The Living Murray (TLM) 2014–15 environmental watering report provides a summary of TLM watering actions in 2014–15.
This document is The Living Murray Annual Environmental Watering Plan for 2014–15 which focuses on the water delivery aspects of The Living Murray.
These guidelines set out additional information to guide people involved in the planning or management of environmental water about the process to follow when applying the method.
26 February 2016
Flows along the River Murray are expected to vary downstream of the junction with the Goulburn River as environmental water moves through the river this autumn.
See where environmental water was delivered against the annual watering priorities in 2014–15.
15 December 2015
This document provides an overview and context for the development of the Basin annual environmental watering priorities (Priorities) for 2013-14.
10 December 2015
The hydrologic indicator site method was used by the Authority to assess the environmental water needs of the Murray–Darling Basin and determine the proposed environmentally sustainable level of take (ESLT)