Search results
Displaying 61 - 70 of 78
Guidelines for supply and constraint measure feasibility studies have been developed by Basin jurisdictions.
21 June 2016
This report shows technical work and information that we have collected through our talks with stakeholders from the Murrumbidgee since early 2013. This report was first released as a draft for community feedback in December of 2014.
In June 2015, the Australian Senate set up a select committee to look at the Murray–Darling Basin Plan.
16 December 2015
This report shows technical work and information that we have collected through our talks with stakeholders on the Lower Darling River, since early 2013.
15 December 2015
This report shows the technical work and information that we have collected through our talks with stakeholders from the Gwydir region since early 2013.
5 December 2015
This report shows technical work and information that we have collected through our talks with stakeholders during 2013-14 along the River Murray in South Australia.
5 December 2015
This report shows the technical work and information that we have collected through our talks with stakeholders from Yarrawonga Weir to Wakool Junction since early 2013.
5 December 2015
This report shows technical work and a summary of community perspectives that have been gained over many years of discussion with communities in the Hume–Yarrawonga reach of the River Murray. The report was first released as a draft in November 2014.
27 November 2015
This report shows the technical work and information that we have collected through our talks with a wide range of people along the Goulburn River, since early 2013.
The stocktake provides independent advice to the Ministerial Council on the potential effectiveness of measures being considered by the Basin state governments towards adjusting the sustainable diversion limit.