Search results
Displaying 1 - 10 of 45
2 August 2024
A suite of options to improve the movement of water through the Barmah–Millewa Reach of the Murray River.
1 August 2024
The Barmah Forest in Victoria and the Millewa Forest in New South Wales include wetlands of international significance. Report cards are updated every year.
1 August 2024
Monitoring reports from the Barmah–Millewa Forest, one of The Living Murray icon sites.
A renewed agreement between WaterNSW and Murray Irrigation Limited (MIL) will help to move water around the Barmah Choke for the 2024–25 water year.
The Barmah Choke water trade balance to start the 2024–25 water year will deliver trade opportunity for irrigators.
30 October 2023
In 2019, the MDBA undertook a detailed survey of the River Murray channel through the Barmah–Millewa Reach. This revealed the presence of a very large quantity of sand on the bed of the river, something that was not expected. Since then, several further studies have been undertaken to investigate the extent and source of the sand, the rate that it is moving at and options to manage it. Reports of these studies are provided below.
23 April 2023
It is up to individual irrigators to determine what they grow, what the water requirements are for their selected crops and how much water will be needed for different growth stages and their region's climatic conditions.
Barmah–Millewa Feasibility Study wrap up from the MDBA.
21 March 2023
The Murray–Darling Basin Authority is moving ahead with detailed design work on a suite of options to improve the movement of water through the Barmah–Millewa Reach of the Murray River.
26 January 2023
The Barmah Choke has a default trade restriction in place. This is necessary to protect water delivery to existing water entitlement holders and maintain the river environment in the Choke.