Search results
Displaying 1 - 10 of 116
12 May 2025
The final event celebrating the 20-year anniversary of The Living Murray program was recently held at the Barmah–Millewa Forest, recognising the achievements of one the largest river restoration projects in Australia.
11 February 2025
This report presents a stocktake and analysis of completed, current and proposed activities and initiatives which focus on improving longitudinal surface water connectivity across the northern Murray–Darling Basin (the northern Basin) ‘to and through’ Menindee Lakes.
Longitudinal connectivity along and between river reaches is critical for maintaining healthy ecosystems and supports a wide range of social, cultural and economic values.
The Murray–Darling Basin Authority (MDBA) has reassured communities the storages and weirs are well positioned to meet irrigation, community, and environmental needs this summer.
11 December 2024
The Annual Operating Outlook (AOO) describes the potential operating strategies under a range of possible climatic conditions that may occur over the water year.
26 November 2024
More than 50 stakeholders recently attended a community event at Hattah-Kulkyne National Park celebrating 2 decades of The Living Murray (TLM) program.
13 November 2024
The sustainable use of groundwater is vital to ensuring the health of the Murray–Darling Basin.
26 September 2024
River Murray Data website redeveloped to improve user experience.
14 August 2024
Water management means that water can be delivered to support local communities, businesses and industries, Australian agriculture and unique ecosystems.
14 August 2024
Despite a dry start to the water year with inflows well below average, the total active storage volume for the Murray–Darling Basin remains high at 6,770 gigalitres (GL).
1 August 2024
Monitoring reports from Gunbower Forest, one of The Living Murray icon sites.