Search results
Displaying 1 - 5 of 5
28 August 2023
This water resource plan is the prevailing management plan for the surface water and groundwater resources in the Warrego–Paroo–Nebine water resource plan area.
24 November 2021
In late March 2019, rain fell in the Namoi, Macquarie and Warrego catchments which led to the first significant flow to occur along those systems, for an extended period of time.
28 October 2021
The Paroo River is the last free-flowing river of the Murray–Darling Basin. Flowing when heavy rains fall in its northern catchment.
28 October 2021
The Warrego River is located in the top north-west of the Murray–Darling Basin, directly east of the Paroo River catchment.
12 December 2015
This document contains a longitudinal map of Paroo.