Search results
Displaying 1 - 4 of 4
The Murray–Darling Basin Authority (MDBA) has reassured communities the storages and weirs are well positioned to meet irrigation, community, and environmental needs this summer.
14 August 2024
Despite a dry start to the water year with inflows well below average, the total active storage volume for the Murray–Darling Basin remains high at 6,770 gigalitres (GL).
15 August 2023
Each year we release an Annual Operating Outlook for the River Murray. It explains how we may operate the River Murray system across a range of possible climatic and rainfall scenarios.
21 March 2023
The Murray–Darling Basin Authority is moving ahead with detailed design work on a suite of options to improve the movement of water through the Barmah–Millewa Reach of the Murray River.