Search results
Displaying 1 - 9 of 9
10 October 2024
History has never forgotten Wentworth in southwestern New South Wales (NSW). Now locals are working to preserve some of that history.
16 April 2024
We have offices and staff scattered throughout the Basin, giving our team a front row seat to community activities and Basin operations. Check out some of the recent photos our staff have snapped throughout April.
28 August 2023
This water resource plan is the prevailing management plan for the surface water and groundwater resources in the Warrego–Paroo–Nebine water resource plan area.
29 June 2023
This water resource plan is the prevailing management plan for the groundwater resources in the Darling Alluvium water resource plan (WRP) area. The plan was accredited by the Australian Government Minister as being consistent with the Basin Plan and commenced on 28 June 2023.
The Darling (Baaka) River connects the entire river network of the northern Murray–Darling Basin with the southern Basin where it joins the River Murray at Wentworth, in south-west New South Wales.
28 October 2021
The Paroo River is the last free-flowing river of the Murray–Darling Basin. Flowing when heavy rains fall in its northern catchment.
9 December 2019
This report outlines the methodology and example results from using satellite imagery to study flow inundation patterns across the lower Balonne and middle Darling regions.
12 December 2015
This document contains a longitudinal map of Paroo.
16 November 2011
The Upper Darling area associated with the salt interception scheme is located on the eastern bank of the Daring River approximately 30 km southwest of Bourke.