Search results
Displaying 61 - 66 of 66
9 December 2019
In 2007–2008 CSIRO Murray-Darling Basin Sustainable Yields (MDBSY) project published a series of reports documenting water availability across the Murray-Darling Basin, including an assessment of the likely impacts of climate change to ~2030 on water availability (e.g. CSIRO 2008a).
9 December 2019
This report summarises the key lessons learnt from the Millennium drought for operation of the River Murray System and the changes made since then to improve water resource management in extreme dry conditions.
9 December 2019
This report outlines the methodology and example results from using satellite imagery to study flow inundation patterns across the lower Balonne and middle Darling regions.
27 November 2015
This report includes the River Murray revised Water Quality Monitoring Program to characterise the overall water quality changes over time.
16 November 2011
The Upper Darling area associated with the salt interception scheme is located on the eastern bank of the Daring River approximately 30 km southwest of Bourke.
9 April 2010
The Basin Salinity Management Strategy (BSMS) guides communities and all Australian governments in working together to control salinity and protecting key natural resource values within their catchments, consistent with the principles of the Integrated Catchment Management Policy Statement (ICM).
Pagination
- First page
- Previous page
- 1
- 2
- 3
- 4
- 5
- 6
- 7