Search results
Displaying 81 - 90 of 117
Work is underway by the Murray–Darling Basin Authority and Goulburn–Murray Water to reinstate the Mildura weir and lock 11.
26 January 2023
In response to the declining flow capacity, the increasing risks, and the recommendation that a range of intervention measures be investigated, the MDBA instigated the Barmah–Millewa Feasibility Study (BMFS). Six options were investigated as part of the Barmah–Millewa Feasibility Study.
19 January 2023
The Barmah–Millewa Reach, or the narrowest parts of it, are referred to as the ‘The Narrows’. It was previously referred to as Barmah Choke.
19 January 2023
The Euston weir and lock 15 will be reinstated next week as high flows in the River Murray continue to recede.
21 December 2022
Watch our webinar for the latest on the Barmah-Millewa Feasibility Study.
21 December 2022
In response to the declining flow capacity, the increasing risks, and the recommendation that a range of intervention measures be investigated, the MDBA instigated the Barmah–Millewa Feasibility Study (BMFS). Six options were investigated as part of the Barmah–Millewa Feasibility Study.
14 December 2022
Food Next Door Co-op and local water owners support Mildura’s landless migrants and refugees to do small-scale regenerative farming.
16 November 2022
The JS Collings Trophy is awarded annually by the MDBA for excellence in the maintenance of infrastructure along the River Murray.
29 October 2022
Flows in the River Murray System vary widely depending on a range of factors, including rainfall, inflows, evaporation, and demand for water for human use.
23 September 2022
The following can be attributed to Murray–Darling Basin Authority (MDBA) Executive Director of River Management Andrew Reynolds.