Search results
Displaying 31 - 40 of 63
26 January 2023
In response to the declining flow capacity, the increasing risks, and the recommendation that a range of intervention measures be investigated, the MDBA instigated the Barmah–Millewa Feasibility Study (BMFS). Six options were investigated as part of the Barmah–Millewa Feasibility Study.
19 January 2023
The Barmah–Millewa Reach, or the narrowest parts of it, are referred to as the ‘The Narrows’. It was previously referred to as Barmah Choke.
19 January 2023
The Euston weir and lock 15 will be reinstated next week as high flows in the River Murray continue to recede.
21 December 2022
Watch our webinar for the latest on the Barmah-Millewa Feasibility Study.
21 December 2022
In response to the declining flow capacity, the increasing risks, and the recommendation that a range of intervention measures be investigated, the MDBA instigated the Barmah–Millewa Feasibility Study (BMFS). Six options were investigated as part of the Barmah–Millewa Feasibility Study.
14 December 2022
Food Next Door Co-op and local water owners support Mildura’s landless migrants and refugees to do small-scale regenerative farming.
16 November 2022
The JS Collings Trophy is awarded annually by the MDBA for excellence in the maintenance of infrastructure along the River Murray.
4 August 2022
Funding has been made available for crucial projects that will secure the health of iconic sites in the Gwydir Valley.
19 July 2022
The Gwydir River begins high in the Great Dividing Range of northern New South Wales.
The delivery of water from the major storages in the Upper Murray to irrigators throughout the Basin can be challenging. There are a number of constraints that impact water delivery to below the Barmah Reach, such as the length of time required to deliver water and the amount of water that can be delivered at any one time.