2020 Basin Plan Evaluation Framework documents

The 2020 Evaluation Framework sets out the overarching approach to the Murray–Darling Basin Authority (MDBA) led evaluation of the effectiveness of the Basin Plan.

The Basin Plan must be evaluated every 5 years. The framework used in 2020 is being reviewed again to incorporate lessons into the next evaluation.

2020 Basin Plan Evaluation downloads
Publication title Published File type File size
Summary of the Basin Plan Evaluation Framework
PDF
417.94 KB
Framework for evaluating the Basin Plan

This document was updated in August 2019 to correct some typographical errors


PDF
1.75 MB

Published date: 17 November 2021